| 7-2006 |
Access to Exits from Elevator Lobbies |
View Summary
|
View Rule |
| 25-2005 |
Use of Wired Glass in Hazardous Locations |
View Summary
|
View Rule |
| 2-2003 |
Automatic Switching for Lighting in Daylight Zones |
View Summary
|
View Rule |
| 5-2002 |
Exceptions to Installing Fire and Smoke Dampers in Exhaust Only Shafts in other than Highrise Buildings – Prescriptive Path |
View Summary
|
View Rule |
| 7-2002 |
Alterations to Water-Source Heat Pump Systems in Existing Buildings |
View Summary
|
View Rule |
| 17-2002 |
Approved Alternates to Installing 3-Hour Fire Rated Automatic-Closing Assemblies in Transformer Vaults Doorways |
View Summary
|
View Rule |
| 19-2002 |
Use of Seattle-ENVSTD Computer Program to Demonstrate Nonresidential Building Envelope Compliance with the 2002 Seattle Energy Code |
View Summary
|
View Rule |
| 1-2001 |
Fees for Environmental Review Signs |
View Summary
|
View Rule |
| 3-2001 |
Approved Alternate Accessibility Guidelines for Building Elements Designed for Children’s Use |
View Summary
|
View Rule |
| 9-2001 |
Exceptions for Installing Fire and Smoke Dampers in Exhaust Shafts Served by a Continuously Operating Fan |
View Summary
|
View Rule |
| 11-2001 |
Limited Code Alternates for Day Care Centers |
View Summary
|
View Rule |
| 6-2000 |
Determination of Certain Multifamily Development Standards on Lots Zoned Partly Single Family and Partly Multifamily |
View Summary
|
View Rule |
| 15-2000 |
Visible Alarms in High Rise Buildings |
View Summary
|
View Rule |
| 18-2000 |
Protection Required by Seattle Building Code Table 5-A for Curtain Walls |
View Summary
|
View Rule |
| 22-2000 |
Submittal Requirements for Open-Web Steel Joist Framing Products |
View Summary
|
View Rule |
| 5-99 |
Storage of Vehicles Outdoors on Single-Family Lots |
View Summary
|
View Rule |
| 11-99 |
Rescinding Director's Rule 11-78 |
View Summary
|
View Rule |
| 19-99 |
Energy Code Pre-Calculated Prescriptive Compliance Options for Group R Occupancy with Metal Framing |
View Summary
|
View Rule |
| 22-99 |
Adoption of ASME Boiler and Pressure Vessel Code Addenda |
View Summary
|
View Rule |
| 10-97 |
Clarification of the Fee Subtitle |
View Summary
|
View Rule |
| 12-97 |
Non-Metallic Piping Used in Compressed Air Systems |
View Summary
|
View Rule |
| 2-96 |
Selection of Environmental Impact Statement (EIS) Consultants |
View Summary
|
View Rule |
| 6-96 |
Duties and Responsibilities of Insuring Company Inspectors - Boiler and Pressure Vessel Inspection |
View Summary
|
View Rule |
| 7-96 |
Height of Chimneys on Floating Homes |
View Summary
|
View Rule |
| 16-96 |
Building Identification Plan Requirement for Properties Having More than Two Buildings |
View Summary
|
View Rule |
| 18-96 |
Seismic Bracing of Ducts |
View Summary
|
View Rule |
| 31-96 |
Adoption of 1995 National Board of Boiler and Pressure Vessel Inspectors Inspection Code (ANSI NB-23) |
View Summary
|
View Rule |
| 37-96 |
Townhouse Platting and Resulting Nonconformities |
View Summary
|
View Rule |
| 5-95 |
Additional Reference for Determining Property Owners, Commercial Lessees and Residents |
View Summary
|
View Rule |
| 6-95 |
Supplemental Rent Assistance: Definitions and Procedures |
View Summary
|
View Rule |
| 9-95 |
Mixed Use Development With Residential and Nonresidential Uses in Separate Structures |
View Summary
|
View Rule |
| 14-95 |
Return of Applications Requiring Corrections |
View Summary
|
View Rule |
| 12-93 |
Reviews By the Director |
View Summary
|
View Rule |
| 20-93 |
Public Benefit Features: Guidelines for Evaluating Bonus and TDR Projects, Administrative Procedures and Submittal Requirements in Downtown Zones
(ALERT: As of February 15, 2006 this rule is in the process of being changed to respond to Land Use Code amendments enacted in Summer 2001. Portions of this rule have been superseded by these code amendments. If you have questions, please call Dennis Meier at (206)684-8270.) |
View Summary
|
View Rule |
| 5-92 |
Seattle Energy Code Requirements for Additions, Alterations and Repairs to the Building Envelope and Changes of Occupancy or Use (Including from Unheated to Heated Space) in Existing Buildings |
View Summary
|
View Rule |
| 7-92 |
Requirements for Pressure Vessels Installed Underground |
View Summary
|
View Rule |
| 8-92 |
Permit Fee for Provision of Radon Detectors |
View Summary
|
View Rule |
| 9-92 |
Adoption of Addenda to the Safety Code for Elevators and Escalators ANSI/ASME A17.1-1987 |
View Summary
|
View Rule |
| 13-92 |
Landscape Standards for Compliance with the Land Use Code and SEPA Requirements |
View Summary
|
View Rule |
| 14-92 |
Combination Systems - Potable Water Heaters that Provide Both Potable Water and Water for Space Heating |
View Summary
|
View Rule |
| 15-91 |
HVAC Cooling Equipment - Application of EER and IPLV Requirements |
View Summary
|
View Rule |
| 2-90 |
Rental Housing Registration Program Interpretation: Procedures, Definitions and Implementation |
View Summary
|
View Rule |
| 5-90 |
Single Exit Stairway Enclosures |
View Summary
|
View Rule |
| 9-90 |
Building Code Section 702 Code Alternate for Mixed Occupancy, Mixed Construction Buildings |
View Summary
|
View Rule |
| 21-90 |
Clarification of the Phrase "Major Reconstruction or Rehabilitation" as a Just Cause for Eviction |
View Summary
|
View Rule |
| 24-90 |
Revisions to Component Performance Calculations Procedures for Group R Occupancy and Addition of Log Home Compliance Option (as required by the Washington State Energy Code) |
View Summary
|
View Rule |
| 28-90 |
Control and Limit Device Requirements as Required by the Washington State Boiler Law (Low Water Cutoffs, Temperature Controls, Pressure Controls and Flow Switches) |
View Summary
|
View Rule |
| 6-89 |
Prescriptive/Component Performance Compliance Alternate for Seattle Energy Code Major Projects |
View Summary
|
View Rule |
| 7-89 |
Pre-Permit Review of Electrical Plans |
View Summary
|
View Rule |
| 9-89 |
Just Cause Eviction When Building to be Demolished or Converted: When Tenancy Can be Terminated |
View Summary
|
View Rule |
| 12-89 |
Standard Key for Public Access to Chairlifts and Wheelchair Lifts |
View Summary
|
View Rule |
| 19-89 |
Partial Application for Building Permits/Vesting and Permit Expiration |
View Summary
|
View Rule |
| 22-89 |
Grading and Landfill in Shoreline Environments |
View Summary
|
View Rule |
| 23-89 |
Setting of Fees to Recover City Costs for Review of Projects Subject to the Northgate Area Interim Traffic Standards |
View Summary
|
View Rule |
| 3-88 |
Standards for Closure and Maintenance of Vacant Buildings |
View Summary
|
View Rule |
| 4-88 |
Clarification of the Phrase "The Owner's Own Housing Unit" |
View Summary
|
View Rule |
| 7-88 |
Clarification of "Criminal Activity" as a Just Cause for Eviction |
View Summary
|
View Rule |
| 8-88 |
Interpretation of the Term "Nuisance" to Include "Drug-related Activity" as a Just Cause for Eviction |
View Summary
|
View Rule |
| 9-88 |
Security Requirements for Main Entrance Doors |
View Summary
|
View Rule |
| 13-88 |
Location of Water Supply Outflows (Faucets) |
View Summary
|
View Rule |
| 17-88 |
Permitted Height of Wall, Marquee, Under Marquee and Canopy Signs in Commercial and Industrial Zones |
View Summary
|
View Rule |
| 23-88 |
Key Switch Requirements for Phase l Elevator Recall -- New Installation and Major Alterations |
View Summary
|
View Rule |
| 28-88 |
Minimum Float Clearance for Floating Home Remodeling, Replacement or New Constructions |
View Summary
|
View Rule |
| 31-88 |
Lot Coverage Exceptions in Multifamily Zones |
View Summary
|
View Rule |
| 34-88 |
Standards for Protecting Knob-and-Tube Wiring when Thermal Insulation is Installed |
View Summary
|
View Rule |
| 35-88 |
Clarifying the Adoptions of National Fire Protection Association Standards 85A and 85B (Furnace Explosion Controls) |
View Summary
|
View Rule |
| 36-88 |
Fill Slopes in Excess of 2 Horizontal to 1 Vertical: Engineered Design |
View Summary
|
View Rule |
| 38-88 |
Opening Protection Requirements for Group R, Division 1 Occupancies of Type V-One-Hour Construction in the Downtown Fire District |
View Summary
|
View Rule |
| 39-88 |
Sprinklers, Fire Alarms and Sprinkler Controls in Elevator Machinery Rooms of Fully Sprinklered Buildings |
View Summary
|
View Rule |
| 45-88 |
Minimum Pipe Insulation for Recirculating Service Water Heating Systems |
View Summary
|
View Rule |
| 46-88 |
Demonstration of Energy-Efficiency for Furnaces of Capacity Over 225,000 Btu/H and Boilers of Capacity Over 300,000 Btu/H |
View Summary
|
View Rule |
| 48-88 |
State Environmental Policy Act (SEPA) and Accessory Residential Parking |
View Summary
|
View Rule |
| 52-88 |
Preparation of an Environmental Impact Statement |
View Summary
|
View Rule |
| 53-88 |
Master Use Permit Procedural Requirements Applied to Projects for which SEPA Determinations have been Issued by Lead Agencies other than the City of Seattle |
View Summary
|
View Rule |
| 55-88 |
Application Notice Requirements for Projects Located in Environmentally Sensitive Areas |
View Summary
|
View Rule |
| 57-88 |
Estimating Repair and Replacement Costs -- Unfit Buildings |
View Summary
|
View Rule |
| 3-87 |
Energy Consumption and Peak Demand Information for Environmental Review |
View Summary
|
View Rule |
| 5-87 |
Fuel Selector Switches for Boiler with Multiple Fuel Burners |
View Summary
|
View Rule |
| 13-87 |
Establishment of Day Care Facilities in Existing Children's Institutions |
View Summary
|
View Rule |
| 14-87 |
Vesting of Permits and Permit Applications |
View Summary
|
View Rule |
| 18-87 |
Maximum Design Stresses Allowable without Substantiating Tests for Old Masonry Structures with No or Low Cement Lime Mortar |
View Summary
|
View Rule |
| 28-87 |
Limitation of Heating, Cooling and Ventilation Equipment in Elevator Machine rooms and Hoistways |
View Summary
|
View Rule |
| 37-87 |
Training School and Quartering of Crews as an Accessory Use to Shipbuilding and Repair |
View Summary
|
View Rule |
| 5-86 |
Clarification of the Responsibilities of the SEPA Public Information Center |
View Summary
|
View Rule |
| 9-86 |
Determination of Comparable Housing |
View Summary
|
View Rule |
| 10-86 |
Number of Permitted Curb Cuts for Lots Crossed by Vehicular Access Easements |
View Summary
|
View Rule |
| 12-86 |
Design Departure: Administrative Guidelines for Evaluating Projects, Administrative Procedure and Submittal Requirements |
View Summary
|
View Rule |
| 20-86 |
Methods for Measuring Sign Area, Number and Dispersion |
View Summary
|
View Rule |
| 21-86 |
Garage Doors in Commercial Zones when Parking is Screened by the Façade of a Structure |
View Summary
|
View Rule |
| 26-86 |
Method of Wiring for Stage Set Lighting and Stage Effects that are not Fixed as to Location |
View Summary
|
View Rule |
| 28-86 |
Use of Vinyl Siding: Standards and Approval |
View Summary
|
View Rule |
| 29-86 |
Fees for Temporary Relocation of Police and Fire Stations |
View Summary
|
View Rule |
| 30-86 |
Fees to Establish Computer Contact Numbers and Failure to Appear for an Application Intake Appointment |
View Summary
|
View Rule |
| 31-86 |
Large Sign Standards for City Lead Agencies Other Than DCLU (Construction Permits Only) |
View Summary
|
View Rule |
| 32-86 |
Prohibition of Non-Commercial Salvage Yards in Residential Zones |
View Summary
|
View Rule |
| 35-86 |
Horizontal Fire Dampers: Conditions for Approval |
View Summary
|
View Rule |
| 36-86 |
Permit Fees for the Installation of Fuel Burners |
View Summary
|
View Rule |
| 37-86 |
Environmental Review and Mitigation of Traffic and Parking Impacts for Projects Vested to Title 24 (Zoning Ordinance) |
View Summary
|
View Rule |
| 39-86 |
Feedwater Requirements for Power Boilers |
View Summary
|
View Rule |
| 40-86 |
Awnings and Canopies |
View Summary
|
View Rule |
| 3-85 |
Rule Relating to Regulation of Dish Antennae and Similar Devices |
View Summary
|
View Rule |
| 5-85 |
Rescinding and Reconfirming Director's Rules Related to the Seattle Shoreline Management Program |
View Summary
|
View Rule |
| 6-85 |
Side Yard Agreements for Reverse Corner Lots |
View Summary
|
View Rule |
| 7-85 |
Elevator Seismic Requirements |
View Summary
|
View Rule |
| 9-85 |
Permit Requirements for Off-Premises Signs |
View Summary
|
View Rule |
| 14-85 |
Measuring Rear Yards |
View Summary
|
View Rule |
| 16-85 |
Additions of Dwelling Units to Existing Structures in Multi-Family Zones: Parking Requirements |
View Summary
|
View Rule |
| 5-84 |
Transition Rule for Major Projects Energy Analysis Requirements |
View Summary
|
View Rule |
| 8-84 |
Standard Design Building for Energy Code Analysis |
View Summary
|
View Rule |
| 9-84 |
Siting and Building Form Analysis for Energy Code Compliance |
View Summary
|
View Rule |
| 10-84 |
Clarification of Gross Floor Area Calculations for Major Institutions |
View Summary
|
View Rule |
| 12-84 |
Hydronic Heat Pumps - Heating Mode |
View Summary
|
View Rule |
| 14-84 |
Delays Resulting from Litigation of "Existing" Contract Rezones and Planned Unit Developments |
View Summary
|
View Rule |
| 18-84 |
Use of Smoke Detector-Activated Doors for Smoke Control at the Entrance to Public Spaces for which a Floor Area Ratio Bonus has been Granted |
View Summary
|
View Rule |
| 20-84 |
Use of Pressurized Stair in Single Exit Frame Construction - R-1 Occupancies |
View Summary
|
View Rule |
| 21-84 |
Electrical, Gas and Oil Space Heating Appliances Installation Under Stairway |
View Summary
|
View Rule |
| 23-84 |
Replacement of Abated Nonconforming Structures |
View Summary
|
View Rule |
| 24-84 |
Retirement Facilities: Classification as Group Home, Apartment or Ground Related Structure and Permitted Accessory Uses |
View Summary
|
View Rule |
| 28-84 |
Parking Conditions Imposed on New Development Proposals in Downtown Seattle |
View Summary
|
View Rule |
| 3-83 |
Vertical Distance Between Dwelling Units and Required Open Space for Ground-Related Structures in Multi-Family Zones |
View Summary
|
View Rule |
| 4-83 |
Privacy of Required Open Space for Ground-Related Structures in Multi-Family Zones |
View Summary
|
View Rule |
| 5-83 |
Handicap Vertical and Inclined Lifts - Applicable Fees |
View Summary
|
View Rule |
| 10-83 |
Shoreline Permit Not Required for Nonchemical Milfoil Control |
View Summary
|
View Rule |
| 13-83 |
Interim Greenbelt Preserves Overlay District |
View Summary
|
View Rule |
| 14-83 |
Fees for Building Permits to Comply with Article 93 of the Seattle Fire Code |
View Summary
|
View Rule |
| 16-83 |
Height Measurements in the Shoreline District Where the Underlying Zoning is Residential |
View Summary
|
View Rule |
| 17-83 |
Early Notice of Projects Requiring Specification of Design Terms for Review of Public Amenity Features Proposed to Achieve Floor Area Bonuses |
View Summary
|
View Rule |
| 27-83 |
Minor Expansion of Institutions within Existing Structures |
View Summary
|
View Rule |
| 28-83 |
Clarification of Electrical Permit Fees for Low Voltage Communication Systems Connected to Central Station System (Telephones) |
View Summary
|
View Rule |
| 1-82 |
Master Use Permit Application Fees for "Use" Approvals |
View Summary
|
View Rule |
| 2-82 |
Clarification of Sections of the 1982 Permit Fee Ordinance (Ord. 110264) |
View Summary
|
View Rule |
| 3-82 |
Design Principles for Reviewing Public Amenity Features Used for Floor Area Bonuses in BM and CM Zones |
View Summary
|
View Rule |
| 4-82 |
Definition of the Term "Under Construction" as used in the Housing Preservation Ordinance |
View Summary
|
View Rule |
| 5-82 |
Product Approval for Manually Operated Releasing Device for Security Window Grills |
View Summary
|
View Rule |
| 6-82 |
Product Approval for High Rise Signs |
View Summary
|
View Rule |
| 8-82 |
Minimum Size Plans for Metal Plate Connected Wood Truss Drawings |
View Summary
|
View Rule |
| 13-82 |
Parking Requirements for Day Care Centers in Church Buildings |
View Summary
|
View Rule |
| 14-82 |
Application and Use of Appendix A in the SEPA Policy Ordinance 107678 |
View Summary
|
View Rule |
| 15-82 |
Use of New Comprehensive Plan in Decision Making |
View Summary
|
View Rule |
| 16-82 |
Replacement of Residence Served by Non-Conforming Access Easement |
View Summary
|
View Rule |
| 19-82 |
Exemption to Large Sign Requirement |
View Summary
|
View Rule |
| 25-82 |
Clarification and Revision of Director's rules Published under Title 24 (Zoning Code) Due to the Adoption of the New Single and Multi-Family Land Use Regulations (Title 23) |
View Summary
|
View Rule |
| 26-82 |
Transition to the Land Use Code |
View Summary
|
View Rule |
| 28-82 |
Requirements for Legal Agreements and Deed Restrictions Linking Properties for Purposes of Calculating Floor Area Ration in the BM, CM, and CMT Zones |
View Summary
|
View Rule |
| 29-82 |
Use of #18 and #16 Wire in Power-Limited Fire-Protective Signaling Circuits |
View Summary
|
View Rule |
| 33-82 |
Transition Rule for Curb Cuts in Residential Zones |
View Summary
|
View Rule |
| 34-82 |
Rules Governing Zoning Violation Appeals Before DCLU |
View Summary
|
View Rule |
| 36-82 |
Application of SEPA in Section 23.76.24A Director's Decision on Master Use Permit |
View Summary
|
View Rule |
| 40-82 |
Reduction in Parking Requirements when Converting from an Existing Non-Residential to a Residential Use in Multi-Family Zones |
View Summary
|
View Rule |
| 48-82 |
Exemptions to the Large Sign Requirement of the Land Use Code |
View Summary
|
View Rule |
| 49-82 |
Cancellation of Master Use Permit Applications |
View Summary
|
View Rule |
| 2-81 |
Land Use Fees: A) Short Plats - Lot Line Adjustment
B) Preliminary Work |
View Summary
|
View Rule |
| 4-81 |
To Require Elevator Car Service Outlets to be of the Grounded Type |
View Summary
|
View Rule |
| 6-81 |
Floats Included in Lot Coverage |
View Summary
|
View Rule |
| 7-81 |
Relocation of Existing Housing Preservation Ordinance 109220 |
View Summary
|
View Rule |
| 8-81 |
Clarification of Ordinance Sections Regulating Location of Offices and Clinics in the RMH 350, RMV 200, and RM 800 Zones |
View Summary
|
View Rule |
| 9-81 |
Measurement of Gross Floor Area |
View Summary
|
View Rule |
| 11-81 |
Establishing Fees and Related Items Inadvertently Omitted From 1981 Permit Fee Ordinance, Effective March 1, 1981 |
View Summary
|
View Rule |
| 12-81 |
Transition Procedures for Master Use Permit Applications |
View Summary
|
View Rule |
| 13-81 |
Definition of Family |
View Summary
|
View Rule |
| 14-81 |
Fees for Advisory Housing Code and Required Condominium Conversion Inspection |
View Summary
|
View Rule |
| 16-81 |
Establishing Criteria for Consideration of Changes to Planned Unit Developments Subsequent to Final Plan Approval |
View Summary
|
View Rule |
| 17-81 |
To Remove Conflict in the Elevator Code Construction Requirements for High-Rise Buildings to Preclude Venting of Shafts Through Elevator Machine Rooms |
View Summary
|
View Rule |
| 18-81 |
Establish a Required Standard for Phase I Elevator Control Switching for New Elevator Installations for High-Rise Buildings |
View Summary
|
View Rule |
| 19-81 |
Operation of Existing High-Rise Elevators for Emergency Service |
View Summary
|
View Rule |
| 20-81 |
Setting the Minimum and the Maximum Fee to be Charged for Reestablishment of an Expired Permit |
View Summary
|
View Rule |
| 21-81 |
Enclosure of Unenclosed Parts of the Principal Structure |
View Summary
|
View Rule |
| 22-81 |
Fee for Certification of an Approved Fabricator's Manufacturing Plant |
View Summary
|
View Rule |
| 23-81 |
Fee for Certification of Special Inspectors |
View Summary
|
View Rule |
| 24-81 |
To Establish a Fee for Product Approval Issued by the Department of Construction and Land Use |
View Summary
|
View Rule |
| 26-81 |
Establishing a Land Use Fee Procedure for Master Use Permit Components and for Council Conditional Use Applications with Associated Variances |
View Summary
|
View Rule |
| 27-81 |
Clarification of Scope of ANSI A17.1-1978, Safety Code for Elevators as Adopted by Reference in Chapter 51 of the Seattle Building Code |
View Summary
|
View Rule |
| 28-81 |
Dimensional and Access Requirements for a Shopping Plaza When a Floor Area Ratio Bonus is Claimed in Connection with the Provisions of the Zoning Code |
View Summary
|
View Rule |
| 29-81 |
Clarification of the Term, "Substantial Change" as Used in the Seattle Zoning Code (Ordinance 86300) |
View Summary
|
View Rule |
| 30-81 |
Proposed Declaration of Non-Significance |
View Summary
|
View Rule |
| 32-81 |
Repair of Fire-Damaged Structures that are Nonconforming with Respect to Use or Bulk or that may be Located in the Shoreline District |
View Summary
|
View Rule |
| 34-81 |
Clarification of Annual Operating Certificate Fee for Boilers and Pressure Vessels |
View Summary
|
View Rule |
| 35-81 |
Residential Setback on Upland Lots |
View Summary
|
View Rule |
| 36-81 |
Rear Yard Area Calculations |
View Summary
|
View Rule |
| 40-81 |
Accessory Fueling Facilities for Fire and Police Precinct Stations |
View Summary
|
View Rule |
| 43-81 |
To Make City Elevator Regulations Consistent with State and National Barrier-Free Regulations |
View Summary
|
View Rule |
| 45-81 |
Adoption by DCLU of Parking Standards Previously Adopted by DCD for Moorage Slips Along Westlake Avenue North Between Valley Street and the Fremont Bridge |
View Summary
|
View Rule |
| 46-81 |
Application of RCW 58.17 Regarding Lot Boundary Adjustment to the City of Seattle's Zoning Code |
View Summary
|
View Rule |
| 48-81 |
Loading/Unloading Areas Accessory to Mini-warehouses in the BC Zone |
View Summary
|
View Rule |
| 49-81 |
Architectural Features - Effects on Floor Area Ratio |
View Summary
|
View Rule |
| 50-81 |
Use of Corridors for Return Air Plenums |
View Summary
|
View Rule |
| 51-81 |
Definition of "Accepted Engineering Practice" |
View Summary
|
View Rule |
| 52-81 |
Glazing Limitations in the Seattle Energy Code |
View Summary
|
View Rule |
| 53-81 |
Billing and Lien Filing of Vacant building Inspection Fees |
View Summary
|
View Rule |
| 54-81 |
Transient Moorage Requirements for New Marinas |
View Summary
|
View Rule |
| 55-81 |
Use of Galvanized Metallic Tubing |
View Summary
|
View Rule |
| 56-81 |
Plastic Roof Panels for Structures Accessory to R-3 Occupancies |
View Summary
|
View Rule |
| 57-81 |
Regulated Public Access Requirement for Public Properties |
View Summary
|
View Rule |
| 62-81 |
Transition to 1982 Land Use Fees |
View Summary
|
View Rule |
| 63-81 |
Land Use Fee Refunds and Fees for Preapplication Work |
View Summary
|
View Rule |
| 63-81 |
Land Use Fee Refunds and Fees for Preapplication Work |
View Summary
|
View Rule |
| 2-80 |
Good Faith Effort with Regard to Locating Housing |
View Summary
|
View Rule |
| 3-80 |
Issuance of Development Permits Based Upon a Binding Site Plan in Lieu of Subdivision for Certain Properties when Divided by Lease |
View Summary
|
View Rule |
| 4-80 |
Ground-Fault Circuit Protection at Construction Sites |
View Summary
|
View Rule |
| 5-80 |
Establishing what shall Qualify for: . . . |
View Summary
|
View Rule |
| 6-80 |
Lighting Power Budget for a Building |
View Summary
|
View Rule |
| 7-80 |
Establishing an Interim Energy Code Fee Affecting Building, Mechanical, and Electrical Permit Applications |
View Summary
|
View Rule |
| 8-80 |
Establishment of Fees for Diazo Reproduction of Microfiche Jackets |
View Summary
|
View Rule |
| 9-80 |
Appliation of the Energy Code to Existing Buildings |
View Summary
|
View Rule |
| 10-80 |
Defining the Term Site-Built Fireplaces |
View Summary
|
View Rule |
| 11-80 |
Legalization of Existing Non-Conforming Uses |
View Summary
|
View Rule |
| 12-80 |
Point of Attachment of Conductors Shall be 12 Feet Unless Impracticable in which Case it Shall be No Less than 10 Feet; Also, on Existing Services of any Amperage, a Weatherhead to Weatherhead Connection Shall be Permitted, for Conversions or Service Increases |
View Summary
|
View Rule |
| 13-80 |
Establishing Guidelines for Table 4-11 of the Seattle Energy Code: Internal Lighting Power Budgets by Occupancy |
View Summary
|
View Rule |
| 14-80 |
Accessory Drive-In Banking Facilities |
View Summary
|
View Rule |
| 15-80 |
Establish What Shall Qualify for Unheated Spaces Used for Industrial and Manufacturing Processes |
View Summary
|
View Rule |
| 16-80 |
Amending Superintendent's Ruling 7-80 and Establishing an Interim Energy Code Fee Affecting Building, Mechanical and Electrical Permit Applications |
View Summary
|
View Rule |
| 17-80 |
Clarification of the Terms, "Minor Alteration" and "Material Expansion," as Used Pursuant to the State Environmental Policy Act (RCW 43.21C), and WAC 197-10-170 (1) (k) |
View Summary
|
View Rule |
| 19-80 |
Exemption of Underground Tanks Pursuant to SEPA |
View Summary
|
View Rule |
| 21-80 |
Methods of Computing Required Off-Street Parking Requirements |
View Summary
|
View Rule |
| 22-80 |
Projection of Architectural Features into Required Yards and Exemption of Such Features from Gross Floor Area Calculations |
View Summary
|
View Rule |
| 23-80 |
Raychem "TWDB" Heat Shrinkable Wrap-Around Duct Band for Sealing the Joints in Low, Medium and High Pressure Heating, Ventilating and Air Conditioning Systems. |
View Summary
|
View Rule |
| 24-80 |
Conditional Accessory Parking Areas in R Zones |
View Summary
|
View Rule |
| 25-80 |
Interpretation of Bulk Modifications for Decks, Porches and Architectural Features |
View Summary
|
View Rule |
| 27-80 |
Special Inspection Requirements for Reinforced Masonry |
View Summary
|
View Rule |
| 28-80 |
Amending a Section of the Existing Superintendent's Ruling (7-80) on the Interim energy Code Fees Dealing with Energy Code Fee Associated with Electrical Permits |
View Summary
|
View Rule |
| 30-80 |
Establishing a Minimum Amount of $5.00 for Refunds |
View Summary
|
View Rule |
| 31-80 |
Front Yard Exceptions for Developed Block Fronts in Residential Single-Family Zones |
View Summary
|
View Rule |
| 33-80 |
Establish a Time Limitation of Two Years for Temporarily Out of Service Status for Elevator, Escalator and Dumbwaiter Equipment |
View Summary
|
View Rule |
| 34-80 |
Mezzanine -- Definition for Purpose of Side Yard Calculations |
View Summary
|
View Rule |
| 35-80 |
Shoreline Uses Over Water in Shoreline Environment Zoning Ord. 86300 Section 21A.75 |
View Summary
|
View Rule |
| 37-80 |
Amending Ruling 7-80 and Establishing an Energy Code Fee Affecting Building, Mechanical, and Electrical Permit Application |
View Summary
|
View Rule |
| 38-80 |
Amendment to the Seattle Energy Code as Required by State Law |
View Summary
|
View Rule |
| 39-80 |
1980 Permit Fee Ordinance (108729). Clarification of Section 8, Table E and the Assessment of Fees for Mechanical Systems. This Director's Ruling Expires When the 1981 Permit Fee Ordinance Goes Into Effect |
View Summary
|
View Rule |
| 40-80 |
Superintendent's Ruling 2-80, Good Faith Effort with Regard to Locating Housing |
View Summary
|
View Rule |
| 41-80 |
Use and Parking for Ferry Terminals |
View Summary
|
View Rule |
| 43-80 |
Signs for Public and Semipublic Institutions in Residential Zones and Signs for Conforming Uses in RMH and RMV Zones |
View Summary
|
View Rule |
| 44-80 |
Computing the Number of Dwelling Units Permitted in Multiple Dwellings |
View Summary
|
View Rule |
| 45-80 |
Extent of Automobile Repair and Maintenenace Permitted in Existing Service Stations and Auto Maintenance Constituting Minor Automobile Repair |
View Summary
|
View Rule |
| 46-80 |
Interpretation of Calculation of Fee Reduction for Replacement Uses; Correction of Numerical References; Allowing fore Placement Housing on a Different Site than that of the Demolished Housing; Clarificatgion of Housing Costg Index Calculation; Definition of the Term "Demolition Proceedings"; Clarification of the Term "Net Residential Area"; and Applicability of Ordinance to Governmental Agencies |
View Summary
|
View Rule |
| 48-80 |
Definition of "
Street" Zoning Code |
View Summary
|
View Rule |
| 49-80 |
Excluding Floor Area Used for Accessory Parking for Buildings in the BM, CM and CMT Zones |
View Summary
|
View Rule |
| 50-80 |
Impact Sound Insulation Requirement for Bathroom Floors |
View Summary
|
View Rule |
| 51-80 |
Guidelines for Moving Housed "Within" the City |
View Summary
|
View Rule |
| 52-80 |
To Establish Method of Calculating Fees for Projects in Progress When 1981 Permit Fee Ordinance Goes Into Effect |
View Summary
|
View Rule |
| 54-80 |
To Establish Method of Collecting Land Use Fees as Established in 1981 Permit Fee Ordinance |
View Summary
|
View Rule |
| 1-79 |
Provisions for Life Safety Core in High Rise Buildings, Including Allowance for Dead End Corridors Serving 50 in Offices |
View Summary
|
View Rule |
| 2-79 |
Temporary Office Permits |
View Summary
|
View Rule |
| 3-79 |
Exemption of Second Floors of Two-Story Buildings and Mezzanines with an Occupant Load of Less than 30 from the Provision of a Ramp or an Elevator as a Means of Accessibility for the Disabled |
View Summary
|
View Rule |
| 4-79 |
Building Vacated and Closed or Open to Unauthorized Entry |
View Summary
|
View Rule |
| 7-79 |
Type NM and Type NMC Cables shall be permitted to be used ine one and two family dwellings, or multi-family dwellings and other structures of wood frame construction not exceeding three floors above grade, except in Fire Zone I |
View Summary
|
View Rule |
| 9-79 |
Precast/Prestress Plant Certification Program |
View Summary
|
View Rule |
| 13-79 |
Structural Support of Neon Transformers within Neon Signs and Outline Lighting Cabinets |
View Summary
|
View Rule |
| 15-79 |
Distinction Between Fast Food Restaurant and Other Businesses |
View Summary
|
View Rule |
| 16-79 |
Synthetic Stucco Wall Covering Manufactured by: Kern Tac, Inc. |
View Summary
|
View Rule |
| 18-79 |
Floor and Roof System Ties to Concrete or Masonry Walls |
View Summary
|
View Rule |
| 21-79 |
Provisions of Access to a Lot to Meet Zoning Ordinance Requirements |
View Summary
|
View Rule |
| 23-79 |
Pile Cap Approval |
View Summary
|
View Rule |
| 1-78 |
Fees for Advisory Housing Inspections |
View Summary
|
View Rule |
| 2-78 |
Environmental Review of Projects on Lands Covered by Water |
View Summary
|
View Rule |
| 3-78 |
Requirement for Environmental Review of Change of Use |
View Summary
|
View Rule |
| 5-78 |
Underground and Overhead Service Entrance Conversions - One Family Dwellings |
View Summary
|
View Rule |
| 6-78 |
Determining the Existence of a Dwelling Unit for the Purpose of Code Enforcement |
View Summary
|
View Rule |
| 7-78 |
Modifying or Withdrawing a Notice of Non-Compliance by Granting a Variance |
View Summary
|
View Rule |
| 10-78 |
Signs Erected on a Single Structure for One Business Billed as One Sign |
View Summary
|
View Rule |
| 11-78 |
Service of a Notice and Order |
View Summary
|
View Rule |
| 11-78 |
Service of a Notice and Order |
View Summary
|
View Rule |
| 12-78 |
Tree Houses and Tree Platforms |
View Summary
|
View Rule |
| 13-78 |
Concrete Foundation and Wall Form System Using Unstiffened Plywood Sheets or Slabs |
View Summary
|
View Rule |
| 16-78 |
Temporary Office Permits |
View Summary
|
View Rule |
| 19-78 |
Definition of Slab-on-Grade Floors in Heating Spaces |
View Summary
|
View Rule |
| 20-78 |
When Permits are Required for Grading |
View Summary
|
View Rule |
| 21-78 |
Grading Requirements for Street Work |
View Summary
|
View Rule |
| 22-78 |
Grading Associated with One and Two Family Dwelling Construction and Accessory Structures |
View Summary
|
View Rule |
| 23-78 |
Life of Grading Permits for Board of Public Works Contracts |
View Summary
|
View Rule |
| 25-78 |
Testing and Certification of Welders by the Washington Association of Building Officials |
View Summary
|
View Rule |
| 26-78 |
Minimum Float Clearance for Floating Home Replacement, Remodeling or New Construction |
View Summary
|
View Rule |
| 27-78 |
Heavy Timber Construction - Substitution for One-Hour Construction in Type V-1Hr Buildings |
View Summary
|
View Rule |
| 28-78 |
Wood Jambs for Fire Doors |
View Summary
|
View Rule |
| 29-78 |
Grading Incidental to Structures Not Requiring a Building Permit |
View Summary
|
View Rule |
| 30-78 |
Grading in Conjunction with Maintenance Activities |
View Summary
|
View Rule |
| 31-78 |
Type VN Construction Permitted in Single Family Dwellings Up to Four Stories |
View Summary
|
View Rule |
| 33-78 |
Delivery of the Certificate of Repairs |
View Summary
|
View Rule |
| 3-77 |
Interpretation of Exemption of Interior Remodeling of Existing Structures within the Shoreline District Where No Change of Use is Involved |
View Summary
|
View Rule |
| 5-77 |
Allowing a Maximum Building Height of 4 Stories for Type V-1 Hour Construction with an H Occupancy |
View Summary
|
View Rule |
| 7-77 |
Setback Requirements for Single Family Residences in Shoreline
Areas |
View Summary
|
View Rule |
| 8-77 |
Approving ABS, PVC and Polypropylene Pipe, Tubing Conduits and Raceway as an Alternate to Non-combustible Materials as Required by the Building Code |
View Summary
|
View Rule |
| 9-77 |
Providing Standards for the Installation of Plastic Pipe in Fire-rated Assemblies |
View Summary
|
View Rule |
| 10-77 |
Reinspection of a Building Upon Receipt of a Citizen's Complaint |
View Summary
|
View Rule |
| 11-77 |
Minimum Throw for Dead Bolt of Dead Latch |
View Summary
|
View Rule |
| 12-77 |
Storage, Maintenance and Building Service Rooms |
View Summary
|
View Rule |
| 13-77 |
Transcript of Findings of Fact of the Citizens Housing Board |
View Summary
|
View Rule |
| 15-77 |
Cabinets for Storage of Cooking Utensils and Dishes |
View Summary
|
View Rule |
| 16-77 |
Person Whose Health or
Safety is Directly Affected by a Building |
View Summary
|
View Rule |
| 19-77 |
Stair Construction |
View Summary
|
View Rule |
| 20-77 |
Occupant Load |
View Summary
|
View Rule |
| 21-77 |
Granting Reasonable Access to Owners for Performance of Duties Imposed by the Housing Code |
View Summary
|
View Rule |
| 25-77 |
Thermal Transmission Through Concrete Masonry Walls |
View Summary
|
View Rule |
| 26-77 |
Sound Transmission Through Concrete Masonry Walls and Floor Systems (Block and Beam Design) |
View Summary
|
View Rule |
| 27-77 |
Type B - Gas Vents (Manufactured by Ecco Heating Products Ltd) |
View Summary
|
View Rule |
| 28-77 |
Requirement for Guardrails in Group I Occupancies |
View Summary
|
View Rule |
| 29-77 |
Requirement for Bonds for Painted Wall Signs to be Eliminated |
View Summary
|
View Rule |
| 31-77 |
Heavy Timber Construction - No Substitution for One-hour Construction |
View Summary
|
View Rule |
| 32-77 |
Energy Vent, Automatic Gas Venting Device (mfd by Energy Vent of Dayton, Ohio) |
View Summary
|
View Rule |
| 6-76 |
NA |
View Summary
|
View Rule |
| 8-76 |
Product Approval: Polyurethane wall and floor coating |
View Summary
|
View Rule |
| 9-76 |
Product Approval: Pneumatic Tube Conveyor |
View Summary
|
View Rule |
| 16-76 |
Structural Requirements for Storage Racks |
View Summary
|
View Rule |
| 18-76 |
Acceptance of WA State Civil Engineer's Stamp |
View Summary
|
View Rule |
| 19-76 |
Approval of Drawings for Shop Fabricated Products |
View Summary
|
View Rule |
| 20-76 |
Special Inspection Requirements for Special Structural Systems |
View Summary
|
View Rule |
| 21-76 |
Service of Alcoholic Beverages at BN Restaurants |
View Summary
|
View Rule |
| 22-76 |
Heat Pump |
View Summary
|
View Rule |
| 31-76 |
Beauty Shop as a Home Occupation |
View Summary
|
View Rule |
| 33-76 |
Vested Right to Obtain a Building Permit |
View Summary
|
View Rule |
| 34-76 |
Substantive Authority to Condition Proposals |
View Summary
|
View Rule |
| 35-76 |
Front Yard Requirements for Special Conditions/Corner Lots |
View Summary
|
View Rule |
| 37-76 |
Lot Coverage Calculations for Compliance with Shoreline Program |
View Summary
|
View Rule |
| 40-76 |
Defining 'Plenum' as Used in NEC Consistent with Mechanical Code |
View Summary
|
View Rule |
| 41-76 |
Allowing a 2-hour Occupancy Separation Between H-Occupancy and F-1 Occupancy
Storage Garages |
View Summary
|
View Rule |
| 42-76 |
Approval of ICBO Research Recommendations as alternate materials and methods of construction to that specified by the Uniform Building Code |
View Summary
|
View Rule |
| 43-76 |
Retail Television Sales in a BN Zone |
View Summary
|
View Rule |
| 44-76 |
Amusement Devices as an Accessory Use to a Retail Store in a BN Zone |
View Summary
|
View Rule |
| 45-76 |
Proper Zoning Classification for Coin-Operated Amusement Devises as a Principal Use |
View Summary
|
View Rule |
| 46-76 |
Specifying that a Horizontal Exit May Not be Used in Lieu of an Exit Corridor Required from a Stairway Enclosure. |
View Summary
|
View Rule |
| 47-76 |
Withdrawal of Product Approval: Tex-Cote Textured Coating |
View Summary
|
View Rule |